State Engineering & Highway Survey
2005 Survey Highlights
Pavement/maintenance projects planned for the coming year:
|
|---|
| Number of pavement equipment units needed in the coming year: | % of respondents |
|---|
| bridge deck overlays | 47% |
| bridges repaired | 63% |
| new bridges | 64% |
| new pedestrian bridges | 20% |
| temporary panel bridges | 7% |
| Erosion control/geotechnical items to be purchased in the coming year: | % of respondents |
|---|
| erosion control blanket | 47% |
| gabions | 22% |
| geosynthetics | 34% |
| retaining wall system | 30% |
| silt fence/barrier | 59% |
| Bridge projects for the coming year: | % of respondents |
|---|
| bridge deck overlays | 47% |
| bridges repaired | 63% |
| new bridges | 64% |
| new pedestrian bridges | 20% |
| temporary panel bridges | 7% |
| Erosion control/geotechnical items to be purchased in the coming year: | % of respondents |
|---|
| erosion control blanket | 47% |
| gabions | 22% |
| geosynthetics | 34% |
| retaining wall system | 30% |
| silt fence/barrier | 59% |